Posted: February 10, 2017
Last modified: February 10, 2017

Keller Road, north and south of the Maitland Boulevard (State Road 414) intersection, will be closed this weekend as I-4 Ultimate construction crews work to realign the road.

The Keller Road continuous weekend closure will begin at 8 p.m. on Friday, February 10. Opening by 6 a.m. on Monday, February 13, is a new alignment of Keller Road at Maitland Boulevard. The realignment will straighten Keller Road as it approaches Maitland Boulevard from the north and the south.

As a result of realigning Keller Road at the Maitland Boulevard intersection, traffic signal stop bars on Maitland Boulevard will be relocated. Drivers should be cautious when approaching this realigned intersection. The new alignment will improve traffic flow on Keller Road, and it will open an additional area for crews to begin building the westbound Maitland Boulevard bridge over Keller Road.

Detour routes for the continuous weekend closure of Keller Road at Maitland Boulevard is available online at http://fdot.tips/KellerRd. The handout also illustrates the realignment of Keller Road.

Modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving through the work zone.

Download PDFDownload New alignment of Keller Road at Maitland Boulevard opening after weekend closure Handout (PDF format)