Posted: October 17, 2019
Last modified: November 7, 2019

The Florida Department of Transportation (FDOT) is scheduling a traffic pacing operation between midnight and 5 a.m. Friday, November 8, on eastbound Interstate 4 (I-4) from the Beachline Expressway (State Road 528) and Florida’s Turnpike.

During the operation, eastbound I-4 entrance ramps between these limits will be temporarily blocked by law enforcement officers.

The traffic pacing operation and temporary ramp closures are necessary to install an overhead sign truss located east of Florida’s Turnpike.

View or download a detailed map of the temporary westbound I-4 ramp closures necessary for this operation here: https://fdot.tips/31mabCz

Modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving through the work zone.