Posted: January 11, 2019
Last modified: January 11, 2019

The Florida Department of Transportation is temporarily closing eastbound Maitland Boulevard at ground level between Keller Road and Lake Destiny Road nightly at 10 p.m. on January 13-17 and reopening the roadway by 5 a.m. the following mornings. These closures are necessary for wall work.

The elevated, permanent lanes of eastbound Maitland Boulevard and the ramp just beyond Keller Road will remain open during the nightly operations.

Motorists traveling eastbound on Maitland Boulevard will need to turn right onto Keller Road, turn left on Southhall Lane and then turn right on Southhall Lane to continue back onto Maitland Blvd.

View or download a handout for more information and detour maps here: https://fdot.tips/EBMaitland

Modifications or extensions to this schedule may be necessary because of weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving through the work zone.