Posted: September 4, 2018
Last modified: January 23, 2019

Quick Links:

  1. Videos
  2. Outreach Materials
  3. Images

New Configuration of Eastbound Maitland Boulevard Opening in Early September

Maitland motorists traveling on eastbound Maitland Boulevard (State Road 414) will experience a new configuration as soon as the morning of September 8.

The entrance points to eastbound Interstate 4 (I-4) from eastbound Maitland Boulevard will be accessible via two new ramps leading to the permanent elevated roadway. The ramps to eastbound Maitland Boulevard are located just beyond Maitland Summit Boulevard and Keller Road. Signage will guide motorists toward eastbound I-4 on one lane of the new elevated roadway. Motorists seeking to access arterial roads or westbound I-4 will continue on eastbound Maitland Boulevard at ground level.

This interim configuration is necessary to continue constructing eastbound Maitland Boulevard and connecting the interchange ramps.

Later in September, a second shift of eastbound Maitland Boulevard will occur following this new configuration. Modifications or extensions to this schedule may become necessary due to weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving through the work zone.


Videos

Download MP4 of 360 video (requires player that can view 360 videos)

Download MP4 of B-Roll footage

Outreach Materials

Suggested Tweets

Via @I4Ultimate: A new traffic pattern on EB Maitland Blvd. will be in place as soon as Sept. 8, changing how motorists enter EB I-4. Please see attached below for more details:

Via @I4Ultimate: On Sept. 8, a new interim traffic pattern will be in place for eastbound Maitland Blvd. motorists. See more details on all traffic movements at i4ultimate.com/EB414


Images

The I-4 and Maitland Boulevard interchange construction progress, Aug. 20 2018

The I-4 and Maitland Boulevard interchange construction progress, Aug. 20 2018

The I-4 and Maitland Boulevard pre-construction, March 18, 2018