New Lanes of EB I-4 Open Near Lee Road
Latest Articles
The I-4 Ultimate project isn’t just about building roads, it’s about providing the Ultimate travel experience for all types of transportation users, including cyclists and pedestrians improving connections for everyone… Read More
The pedestrian bridge over I-4 in Maitland is now open. The I-4 Ultimate project has been busy building roads, repairing bridges, and reconstructing interchanges along the I-4 corridor, all to… Read More
The managed lanes on Interstate 4 (I-4), known locally as I-4 Express, are now open. On the morning of Saturday, February 26, Central Florida motorists gained access to the new… Read More
All Articles
Sharelines
Posted: December 18, 2017
Last modified: December 18, 2017
All eastbound Interstate 4 (I-4) lanes between Lee Road and Maitland Boulevard were shifted to their new and now permanent location on the morning of December 18.
The eastbound I-4 traffic shift is a significant milestone for the I-4 Ultimate project. The shift marks the first opportunity for motorists to drive on the new travel lanes of eastbound I-4.
A handout detailing the traffic shift on eastbound I-4 between Lee Road and Maitland Boulevard is available online to view or download at: http://fdot.tips/EBI4shift
Motorists are advised to maintain a safe speed when driving through the work zone.