Construction B-Roll
SR 408 Tub Girder install time lapse Day 1 |
---|
Length: 0:12 – 2/14/2018 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
Concrete Deck Pour B-Roll – 5/9/2016 |
---|
Length: 1:00 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
First Beam Setting B-Roll – 3/22/2016 |
---|
Length: 1:02 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
Rolling Roadblock B-Roll – 3/21/2016 |
---|
Length: 0:56 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
SR-408 Ramp Relocation B-Roll |
---|
Length: 1:07 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
MSE Wall Construction B-Roll |
---|
Length: 0:52 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
Formosa Traffic Shift B-Roll |
---|
Length: 1:04 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
Maitland Traffic Shift B-Roll |
---|
Length: 1:04 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
LED Safety Hats B-Roll |
---|
Length: 3:22 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
Hammer Pile Driving B-roll |
---|
Length: 0:52 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |
Vibratory Pile Driving B-Roll |
---|
Length: 1:43 Preview | Download MP4 (Right-click and select “Save Target/Link As”) |