Posted: January 23, 2020
Last modified: February 18, 2020

The Florida Department of Transportation (FDOT) is temporarily closing State Road (S.R.) 408 over Interstate 4 (I-4) as soon as 11 p.m. Saturday, February 22, to 7 a.m. Sunday, February 23. In addition, the I-4 exit ramps to S.R. 408, the S.R. 408 exit ramps to I-4, the westbound S.R. 408 entrance ramp from Division Avenue, and the eastbound S.R. 408 entrance ramp from Orange Blossom Trail (U.S. 17-92/441) will close at the same time.

These closures are necessary to safely pour concrete for a portion of the new westbound S.R. 408 ramp to westbound I-4.

Please view or download a handout detailing the closure and detour map.

For more information about closures at the S.R. 408 interchange and in Downtown Orlando, visit https://i4ultimate.com/408-closures/ and  https://fdot.tips/DowntownOrlando.

Modifications or extensions to this schedule may be necessary because of weather delays or other unforeseen conditions. Motorists are advised to maintain a safe speed when driving through the work zone.