Sharelines

Posted: September 27, 2016
Last modified: January 19, 2017

I-4 Ultimate crews will again attempt a traffic shift of westbound Maitland Boulevard (State Road 414) between westbound Interstate 4 (I-4) and State Road 434 overnight. However, the work is subject to the weather, and late night or overnight rain could result in another postponement.

The current plan calls for crews working throughout the night to have the traffic shift in place for the morning of October 4. Motorists should expect multiple lane closures during the hours of 8 p.m. to 6 a.m. as the westbound lanes of Maitland Boulevard are shifted to newly paved lanes, just south of the existing lanes. An illustration of the westbound Maitland Boulevard traffic shift is available online at fdot.tips/WB414shift. Again, the traffic shift depends on the weather.

Following the traffic shift, work will begin on building an elevated Maitland Boulevard over the cross streets of Lake Destiny Road, Keller Road and Maitland Summit Boulevard. Pile driving for bridge construction could begin as soon as early October.

Motorists are advised to maintain a safe speed when driving through the work zone.

 

Download PDFDownload Westbound Maitland Blvd traffic shift Handout (PDF format)